Ask most developers to compare two loan term sheets and they’ll start with rate, move to leverage, and stop there. I understand why, rate and leverage are the two numbers that are easy to compare across offers, and they drive the headline return math in a pro forma. But across the construction and bridge financings I have reviewed, the deals that got sponsors into trouble, or that sponsors walked away from at the last minute, were almost never about rate. They were about covenants.

The covenants that actually bite

A few show up in almost every negotiation. Debt yield covenants, which can force a partial paydown or trigger a cash sweep if in place NOI dips below a threshold, punishing precisely during lease up, exactly when a sponsor can least afford it. Springing recourse provisions, which convert a loan the sponsor thought was non recourse into a personal guarantee the moment a covenant trips, often for reasons that have nothing to do with actual default risk. And completion guarantees with no carve out for force majeure delays that are entirely outside the sponsor’s control, a permitting delay, a materials shortage, a labor strike.

None of those show up in the headline rate. All of them show up in the outcome when a project doesn’t go exactly according to the pro forma, and no project ever does exactly.

A 25 basis point rate difference is a rounding error next to a springing recourse trigger you didn’t read closely enough.

How to actually compare term sheets

The discipline is a covenant scorecard built alongside the rate comparison: reserve requirements, reporting cadence and cost, cross default provisions to a sponsor’s other debt, prepayment penalties, and the specific triggers for recourse, sweep, or default. Then model the covenant package under a stress case, a six month construction delay, a softer than underwritten lease up, not just the base case. A loan that looks cheaper in the base case can be dramatically more expensive, or simply unworkable, in the stress case, and the stress case is the one that actually determines whether a sponsor survives a difficult stretch with the asset intact.

This is also where a general counsel who understands real estate capital structures, not just contract law generally, earns a seat at the table. The legal read on covenant enforceability and the financial read on covenant consequence need to happen in the same room, not sequentially.

Rate matters. It’s just not where the real cost of capital lives. Sponsors who learn to read the covenant package with the same rigor they apply to the rate will find themselves in fewer forced conversations with their lender at exactly the moment they can least afford one. Kaufman & Company builds with its own capital and does not borrow, so this is a view for the sponsors who do.